Skip to content

Baxter Water Treatment Plant Proposed Sedimentation Sludge Pumps

INDUSTRY:
Water and Sewer

SERVICES:
Geotechnical

LOCATION:
Philadelphia, PA

CLIENT:
Philadelphia Water Department

BCM Engineers (a division of ATC Group Services, LLC) is designing modifications to two existing sludge pumping stations to convert them from submersible stations to wet well-dry well stations at the Philadelphia Water Department Baxter Water Treatment Plant. Sci-Tek provided geotechnical engineering services for this project including the following:

  • Review of available site drawings, geotechnical reports, and test boring information for the site.
  • Geotechnical exploration which included two standard test borings, laboratory testing of select samples of material recovered from the test borings, and evaluation of subsurface conditions at the test boring locations.
  • Preparation of Preliminary Report based on the data obtained which presented opinions on the following:
    • Fill, soil, rock, groundwater conditions and site class for seismic loading
    • Earthwork procedures for the design bearing pressures at the dry well slab
    • Recommended fill materials and compaction requirements
    • Recommended values for lateral earth pressure for the new dry well and temporary shoring
    • Estimated differential settlement for the existing wet well and the new dry well
    • Recommendations for retaining wall for extension of driveway