South Side Park Green Infrastructure Project

INDUSTRY:
Water and Sewer

LOCATION:
Pittsburgh, PA

CLIENT:
Pittsburgh Water

south side park green infrastructure
south side park green infrastructure
south side park green infrastructure

This project is designed to capture and manage wet weather flows and point source mine drainage flows, by means of constructed wetlands, decentralized underground storage, and sewer separation in the M-16 Sewershed. The goal of the project is to help reduce combined sewer overflow and neighborhood flooding. As a subconsultant to Ethos Collaborative, Sci-Tek provided the following services:

  • Stream Flow Monitoring
    • Performed installation and maintenance services.
    • Performed data management.
    • Prepared a flow monitoring report.
  • Water Quality Sampling
    • Performed water quality sampling in areas of mine-related discharge and groundwater seeps.
  • Phase I Environmental Site Assessment
    • Reviewed the site’s history, current and previous uses, utilities, operations, management, waste management practices, and other environmental considerations.
    • Performed a site reconnaissance to evaluate the exterior of buildings of the site to identify evidence of recognized environmental conditions that may require environmental sampling or remedial action.
    • Prepared a Phase I ESA report.
  • Geotechnical Subsurface Exploration
    • Drilled test borings and performed borehole infiltration tests for proposed green stormwater infrastructure facilities
    • Prepared geotechnical report
  • Final Design Services
    • Provided ongoing civil engineering support services for final design including developing project plans and specifications.